Contact
E-mail :lianheqiang1990@126.com
Phone/WhatsApp:+86-15015588002
Address:
No. 218 Jiefu Road, Jieyuan Village, Minzhong Street, Torch Development Zone, Zhongshan City, Guangdong Province
Engineering Case
Shenzhen Airport T3 Terminal
The design proposal submitted by the Italian architectural firm Fuksas has been finally selected for the Shenzhen Airport T3 Terminal. The terminal is expected to be completed and put into use by the end of 2012. Once operational, it will provide 62 near parking positions and several adjacent remote parking positions, accommodating the largest aircraft, the A380, and significantly alleviating the tight parking situation at Shenzhen Airport.
United and strong sealing strips are used for the curtain wall.
Chengdu Shuangliu Airport T2 Terminal
According to reports, after the completion and operation of Terminal 2, the annual passenger throughput capacity will reach 38 million, an increase of nearly 50% compared to the current annual passenger throughput.
The joint strong adhesive strip is used for the curtain wall.
The Tencent Building is located in the North District of the Shenzhen High-tech Park, with a total height of 193 meters, 39 floors above ground, and 3 underground levels. The total construction area is 88,180.38 square meters, with an office area of 69,796.76 square meters. It is a high-rise building with a novel design, complete internal functions, and a leading cultural environment, becoming a new landmark on Shennan Boulevard, which is famous nationwide in the Shenzhen Special Economic Zone.



